The distinction between testing the data and testing the application is often difficult for the business to grasp. However, the primary goal of data migration testing is to ensure that data is correctly extracted, transformed, and loaded into the new target system as designed.
The distinction between testing the data and testing the application is often difficult for the business to grasp. However, the primary goal of data migration testing is to ensure that data is correctly extracted, transformed, and loaded into the new target system as designed.